Bored cast-in-place piles with a lost tip (Fundex technology) are used for constructing pile foundations without soil excavation. The pile is formed by pressing or rotating an casing pipe with a tip into the ground, after which the pipe is extracted, and the shaft is filled with concrete. This technology allows for piling works in complex soil conditions, in dense urban areas, and on sites with restrictions on vibration and noise.
- Site Preparation
Marking the pile field and preparing locations for the drilling rig installation. - Casing Pipe Installation
Pressing the pipe with a lost tip using rotation and pressing methods. - Reinforcement Installation
Installing the reinforcement cage into the formed borehole. - Pile Concreting
Pouring concrete mix while simultaneously extracting the casing pipe. - Pile Head Formation
Preparing the pile for further construction of the pile cap or foundation slab.
Key Features and Advantages of Fundex Technology
-
High Installation Speed
Achieved by combining drilling and concreting operations into one cycle, which eliminates the time spent on installing and extracting the casing column.
-
Minimum Vibration and Noise
The non-impact pressing of the auger makes the technology ideal for work in confined urban conditions where dynamic impacts are prohibited.
-
No Need for Casing Pipes
The borehole walls are held by the auger itself, and then by the pressure of the concrete, which simplifies the process, reduces costs, and eliminates the problem of sludge disposal.
-
Quality Control
Work quality is easily controlled by monitoring the volume of concrete placed, where any deviation immediately signals a potential problem.
-
Good Load-Bearing Capacity
Concrete supply under pressure ensures its dense contact with the soil along the entire surface, forming a monolithic shaft without defects.
-
We will Calculate the Cost of Works
Leave your contacts, and our engineer will prepare a preliminary calculation for you
Prices
The cost of installing bored piles using Fundex technology depends on project parameters and construction site conditions. The price is influenced by the diameter and length of piles, soil type, work volume, equipment accessibility, and reinforcement requirements. To calculate the cost, a pile field project or initial data is usually required: results of engineering-geological surveys, estimated loads, pile diameter and depth, as well as conditions for equipment placement on the site.
| ⌀ 400 | from 5050 |
| ⌀ 450 | from 5250 |
| ⌀ 500 | from 5450 |
| ⌀ 550 | from 5750 |
| ⌀ 600 | от 6050 |
| ⌀ 600 | from 6050 |
We Will Calculate the Cost of the Works

How We Work
Simple and transparent workflow
Request
We receive initial data about the facilityAnalysis
We study geology, loads, and design solutionsSolution Selection
We determine pile parameters and work execution technologyWork Execution
We organize drilling and concrete works on site.Facility Handover
We hand over executive documentation and work resultsFrequently Asked Questions
-
Can such piles be installed without a finished project?
Yes. Based on geological data and estimated loads, we can prepare a preliminary technical solution and pile parameters.
-
Is the technology suitable for urban development?
Yes. The Fundex method is characterized by low vibration levels and is well-suited for work near existing buildings.
-
Can work be carried out on an operating facility?
Yes, provided that the construction site is properly organized and safety requirements are met, work can be performed without stopping the facility's operations.
-
How long does it take to install a pile field?
The duration depends on the number and depth of piles, as well as site conditions. After analyzing the project, we can determine the estimated productivity and work schedule.
Why Choose Us
-
Full Documentation Support During Work
The foreman keeps all necessary logs, and upon completion of work, we provide all required documentation
-
We Work in Any Region of Russia
All year round, in any weather, even in confined site conditions. We take on tasks where others see difficulties.
-
We Regularly Work on Quality
We improve with every new facility. We work in tandem with the customer and promptly resolve all current issues.
-
Competent Work Planning
Own material and technical base, experienced staff, and a 12-hour working day. Motivation for fast and high-quality work execution. A unique ratio of speed to such quality.
-
We Save Your Money
Transparent estimate, justification for every expense item, and full financial reporting are the basis of our cooperation. We are responsible for every ruble spent.
-
-
We Will Calculate the Cost of Works
Leave a request and we will contact you shortly
Trusted By
Have Questions?
Contact Us
We will discuss your project, offer the best solution, and prepare a commercial proposal
-
Individual Approach
We take into account the specifics of your facility and business needs
-
Quick Response
We will respond within 15 minutes during business hours
-
Confidentiality
We guarantee the safety of your data