Technical Walls
Erection of technical walls for housing engineering communications, equipment, and separating functional zones of the building.
-
>50
Units of own equipment
-
>150
Qualified employees
-
2
Production bases in Moscow and Saint Petersburg
-
200+
Civil and industrial construction projects
About the Technology
Technical walls are monolithic reinforced concrete structures that form premises and zones for engineering equipment: pump rooms, ventilation chambers, electrical rooms, heat points, technological pits, and other service areas of the building. Such walls must withstand design loads, ensure rigidity, and maintain precise geometry for further installation of engineering systems.
Works are carried out according to the project, considering embedded parts, sleeves, technological openings, and connections to slabs, floors, and adjacent structures. On-site, formwork is installed, reinforcement is performed, axes, levels, and protective layers are checked, followed by concreting with control over mix quality and concrete care.
Main Stages
- Work Zone Preparation - checking base, reinforcement releases, design axes, and levels.
- Formwork Installation - installing panels, fasteners, and elements to form the design wall thickness.
- Reinforcement - tying reinforcement cages, installing fixators, embedded parts, sleeves, and releases.
- Junction Check - controlling connections with slabs, floors, columns, and adjacent walls.
- Concreting and Handover - supply, compaction of concrete mix, concrete care, and as-built documentation preparation.
Advantages
-
Precise geometry of technical premises
-
High strength and rigidity of structures
-
Ability to install embedded and engineering passages
-
Compatibility with further equipment installation
-
Reliable base for subsequent construction and installation works
-
We will Calculate the Cost of Works
Leave your contacts, and our engineer will prepare a preliminary calculation for you

How We Work
Simple and transparent workflow
Request
Project Analysis
Solution Selection
Work Execution
Handover
Frequently Asked Questions
-
Can work start without a full project?
A project is required for technical walls, as they often include engineering passages, sleeves, and equipment mounting elements. We can preliminarily estimate volumes and prepare organizational solutions.
-
Can work be performed in winter?
Yes, subject to winter concreting technology. It is important to ensure temperature regime, structure protection, and concrete strength gain control.
-
How is work quality controlled?
We check axes, levels, formwork, reinforcement, protective layers, embedded parts, sleeves, and concrete mix quality. Hidden works are recorded in acts and logs.
-
How long does technical wall installation take?
The duration depends on volume, wall height, reinforcement complexity, number of embedded parts, and site conditions. The exact schedule is determined after project analysis.
Why Choose Us
-
Geometry Control
We monitor levels, wall thickness, and structure position
-
Work with Engineering Zones
We consider equipment placement, sleeves, embedded parts, and technological passages
-
Engineering Approach
We check design solutions and junction nodes before starting work
-
Organization of Monolithic Works
We plan formwork, reinforcement, and concreting by sections
-
As-built Documentation
We hand over acts, logs, and documents on completed structures to the customer
-
We Will Calculate the Cost of Works
Leave a request and we will contact you shortly
Trusted By
Have Questions?
Contact Us
We will discuss your project, offer the best solution, and prepare a commercial proposal
-
Individual Approach
We take into account the specifics of your facility and business needs
-
Quick Response
We will respond within 15 minutes during business hours
-
Confidentiality
We guarantee the safety of your data