Pre-design Surveys
From idea to project: accurate data, justified solutions
-
>50
Units of own equipment
-
>150
Qualified employees
-
2
Production bases in Moscow and Saint Petersburg
-
200+
Civil and industrial construction projects
Preparation of initial data for design
Pre-design surveys are the process of collecting and analyzing information before starting the design of a facility. At this stage, site conditions, plot constraints, initial permit documentation, utility networks, geology, equipment access, and potential risks of future construction are checked.
This work is necessary to understand, prior to design decisions, which implementation options for the facility are possible, which will require additional approvals, where technical limitations exist, and what may affect the cost, timing, and organization of construction and installation works.
- Data collection - we study documents related to the site, technical specifications, constraints, existing networks, and available design information.
- Site analysis - we evaluate construction conditions, access roads, terrain, neighboring buildings, storage zones, and equipment placement areas.
- Engineering constraints check - we analyze networks, geological data, hydrology, protection zones, and requirements for future structures.
- Preliminary solutions selection - we form possible options for facility design and work organization on the site.
- Conclusion preparation - we provide the client with a clear technical picture: risks, constraints, necessary data, and next steps.
Advantages
-
Understanding real site conditions before design begins
-
Reducing the risk of errors in design solutions
-
More accurate estimation of construction timelines and budget
-
Identification of constraints before arriving at the site
-
Foundation for competent construction management at subsequent stages
-
We will Calculate the Cost of Works
Leave your contacts, and our engineer will prepare a preliminary calculation for you
Prices
The cost of pre-design surveys depends on the volume of initial data, site area, facility complexity, number of engineering constraints, presence of existing networks, site inspection requirements, and depth of preliminary solutions development. For calculation, we need technical specifications, site data, available drawings, urban planning documents, information about existing buildings, networks, and the planned purpose of the facility.
| Engineering-geological | from 40 000 ₽ |
| Engineering-geodetic (topographic survey) | from 15 000 ₽ |
| Engineering-ecological | from 50 000 ₽ |
| Comprehensive surveys | from 100 000 ₽ |
We Will Calculate the Cost of the Works

How We Work
Simple and transparent workflow
Request
Project Analysis
Solution Selection
Work Execution
Completion
Frequently Asked Questions
-
Can pre-design surveys begin without a complete technical specification?
Yes, we can start with the available data. At the first stage, we will help clarify what information is missing and which documents need to be requested additionally.
-
What is included in pre-design surveys?
Typically, this includes site analysis, initial documentation review, utility networks assessment, constraints identification, construction conditions evaluation, and preliminary implementation options for the facility.
-
Why conduct this stage before design?
It helps to identify technical risks in advance, clarify initial data, and avoid incorporating solutions into the project that would be difficult or expensive to implement later.
-
How long do pre-design surveys take?
The duration depends on the complexity of the facility, completeness of initial data, and scope of analysis. For small tasks, a short inspection is sufficient, while complex objects require more in-depth processing.
Why Choose Us
-
Engineering Approach
We look at the facility from the perspective of future design and construction, not just formal data collection
-
Practical Construction Experience
We understand which solutions actually work on-site and where problems may arise
-
Comprehensive Analysis
We consider the site, networks, equipment, structures, schedule, and organization of construction works
-
Connection to Design
We prepare initial data so that it can be used at subsequent stages of facility design
-
Clear Conclusions
We provide the client not with a set of general formulations, but with specific constraints, risks, and further actions
-
We Will Calculate the Cost of Works
Leave a request and we will contact you shortly
Trusted By
Have Questions?
Contact Us
We will discuss your project, offer the best solution, and prepare a commercial proposal
-
Individual Approach
We take into account the specifics of your facility and business needs
-
Quick Response
We will respond within 15 minutes during business hours
-
Confidentiality
We guarantee the safety of your data