Columns
Erection of monolithic reinforced concrete columns to create a reliable bearing frame for buildings and structures.
-
>50
Units of own equipment
-
>150
Qualified employees
-
2
Production bases in Moscow and Saint Petersburg
-
200+
Civil and industrial construction projects
Monolithic Column Installation
Monolithic columns accept vertical loads from floors, beams, and upper building structures. The accuracy of their installation affects the frame geometry, load-bearing capacity, and the pace of further monolithic works.
Works include base preparation, reinforcement cage installation, formwork mounting, concreting, and strength gain control. It is important to maintain the design position of columns, concrete protective layer, mix compaction quality, and structure verticality.
Main Stages
- Work Zone Preparation - we check levels, axes, reinforcement releases, and base readiness for column installation.
- Reinforcement Cage Installation - we install reinforcement according to the project, control splicing, fixation, and protective layer.
- Formwork Installation - we mount the formwork system, set up geometry, and check structure verticality.
- Concreting - we supply concrete mix, perform laying and vibration compaction without disturbing reinforcement position.
- Formwork Removal and Quality Control - we remove formwork after strength gain, check surface, geometry, and compliance with the project.
Advantages
-
High load-bearing capacity of the structure
-
Accurate load transfer to the foundation and lower floors
-
Ability to install columns of complex section
-
Compatibility with monolithic floors, beams, and stiffness cores
-
Durability of the reinforced concrete frame with proper work control
-
We will Calculate the Cost of Works
Leave your contacts, and our engineer will prepare a preliminary calculation for you

How We Work
Simple and transparent workflow
Request
Project Analysis
Solution Selection
Work Execution
Handover
Frequently Asked Questions
-
Can column installation start without a full project?
A working project is required for bearing structures. Without it, we can only preliminarily estimate volumes, technology, and work sequence, but concreting cannot start without design solutions.
-
Can work be performed in winter?
Yes, monolithic columns can be concreted in winter. For this, winter mixes, heating, structure covering, and concrete temperature control are used.
-
How is column quality controlled?
We check axes, verticality, reinforcement, protective layer, formwork quality, and concrete mix quality. After formwork removal, we control geometry and surface condition.
-
How long does column installation take?
The duration depends on the number of columns, floor height, formwork type, and concreting rate. Usually, works are planned in conjunction with the general monolithic frame construction schedule.
Why Choose Us
-
Experience in Monolithic Works
We perform reinforced concrete structure installation as part of the full construction cycle
-
Engineering Control
We monitor geometry, reinforcement, concreting, and finished structure quality
-
Work According to Project
We comply with working documentation, technological maps, and construction control requirements
-
Own Work Organization
We plan material supply, personnel, formwork, and equipment according to the object schedule
-
Comprehensive Approach
We can perform columns together with the foundation, floors, walls, and other elements of the monolithic frame
-
We Will Calculate the Cost of Works
Leave a request and we will contact you shortly
Trusted By
Have Questions?
Contact Us
We will discuss your project, offer the best solution, and prepare a commercial proposal
-
Individual Approach
We take into account the specifics of your facility and business needs
-
Quick Response
We will respond within 15 minutes during business hours
-