Installation and Laying
Turnkey sewage pipe laying and well installation with connection to existing networks
-
>50
Units of own equipment
-
>150
Qualified employees
-
2
Production bases in Moscow and Saint Petersburg
-
200+
Civil and industrial construction projects
About the Technology
Sewage network installation includes pipeline laying, well installation, base preparation, connection to existing networks, and system operability check. Works are performed for domestic, storm, and drainage sewage on industrial, commercial, and residential objects.
When laying, it is important to maintain design levels, slopes, laying depth, and joint quality. On site, we organize trench development, sand or crushed stone base installation, pipe laying, well installation, backfilling, and work zone restoration.
Main Stages
- Site Preparation - we mark the route, clarify existing communications, and organize the work production zone.
- Trench Development - we perform earthworks considering laying depth, trench width, and soil conditions.
- Base Installation - we prepare the base under the pipeline to ensure stable pipe position and design slope.
- Pipe and Well Installation - we lay sewage pipes, install wells, chambers, and connection elements.
- Check and Backfilling - we control levels, connections, and network operability, after which we perform backfilling and as-built documentation preparation.
Advantages
-
Compliance with design slopes and levels
-
Possibility of connection to existing networks
-
Control of joint and installation node quality
-
Clear as-built documentation after work completion
-
Comprehensive performance of earthwork and installation works
-
We will Calculate the Cost of Works
Leave your contacts, and our engineer will prepare a preliminary calculation for you

How We Work
Simple and transparent workflow
Request
Project Analysis
Solution Selection
Work Execution
Handover
Frequently Asked Questions
-
Can installation start without a ready project?
We can start with site inspection and preliminary assessment. But for accurate work execution, we need project solutions, levels, and connection scheme.
-
Can sewage laying be performed in winter?
Yes, such works are possible. Technology depends on temperature, soil condition, trench depth, and backfill requirements.
-
How is installation quality controlled?
We check slopes, levels, joint quality, pipeline position, and correctness of connection to wells or existing networks.
-
How long does sewage laying take?
The duration depends on route length, laying depth, number of wells, soil conditions, and site constraints.
Why Choose Us
-
Work According to Design Levels
We control slopes and laying depth at key stages
-
Comprehensive Work Performance
We close earthworks, pipe installation, well installation, and connection
-
Experience at Construction Sites
We understand limitations of operating objects, dense development, and parallel works
-
Quality Control
We check joints, base, pipe position, and network readiness for operation
-
As-built Documentation
We hand over documents necessary for acceptance and further system maintenance to the customer
-
We Will Calculate the Cost of Works
Leave a request and we will contact you shortly
Trusted By
Have Questions?
Contact Us
We will discuss your project, offer the best solution, and prepare a commercial proposal
-
Individual Approach
We take into account the specifics of your facility and business needs
-
Quick Response
We will respond within 15 minutes during business hours
-
Confidentiality
We guarantee the safety of your data