Author's and Technical Supervision
Independent control and compliance with standards
-
>50
Units of own equipment
-
>150
Qualified employees
-
2
Production bases in Moscow and Saint Petersburg
-
200+
Civil and industrial construction projects
Control of Compliance with Project and Work Quality
Author's and technical supervision are needed to ensure that the construction of the object is carried out according to project documentation, working drawings, technical solutions, and quality requirements. Questions about nodes, materials, work sequence, deviations from the project, and contractor interaction regularly arise on site.
Control includes checking completed works, recording remarks, participating in the resolution of technical issues, checking as-built documentation, and monitoring the elimination of identified deviations. It is important not just to find an error, but to determine in time how to fix it without stopping the entire construction process and without risk to the further operation of the object.
Main Stages
- Project Documentation Analysis - we study the project, working drawings, technical solutions, specifications, and work control requirements.
- Work Check on Site - we evaluate compliance of actually performed works with the project, regulatory requirements, and agreed solutions.
- Recording Remarks - we document identified deviations, indicate problem areas, causes, and necessary actions for elimination.
- Violation Elimination Control - we check that contractors have eliminated remarks in the required volume and without violating adjacent works.
- As-built Documentation Check - we control the completeness of acts, schemes, logs, and other documents necessary for handing over construction stages.
Advantages
-
Timely identification of deviations from the project
Inspections at each stage — from axis breakdown to fine finishing. Deviations are recorded before they grow into defects
-
Reducing the risk of reworks at late stages of construction
An error in the pit costs pennies, an error under fine finishing costs millions. We find early, fix cheaply
-
Work quality and as-built documentation control
We check concrete, seams, hidden work acts, certificates, and logs — documentation does not diverge from reality
-
More transparent interaction between customer, designers, and contractors
Single protocol of remarks, joint meetings, and understandable reporting — all parties speak the same language
-
Reduction of technical risks during handover and object operation
An object that has passed author's and technical supervision less often gives cracks, leaks, and surprises during the warranty period
-
We will Calculate the Cost of Works
Leave your contacts, and our engineer will prepare a preliminary calculation for you
Prices
The cost of author's and technical supervision depends on the scale of the object, composition of controlled works, construction duration, number of site visits, and required reporting format. Price is also affected by the complexity of design solutions, number of contractors, work intensity, and need for constant specialist presence on the object.\nFor calculation, we need project and working documentation, construction schedule, composition of contractors, list of controlled stages, and customer requirements for reporting. After analysis, we can determine supervision format, inspection frequency, staff composition, and support cost.
| Author's supervision | from 150,000 ₽ |
| Author's control | from 130,000 ₽ |

How We Work
Simple and transparent workflow
Request
Project Analysis
Solution Selection
Work Execution
Handover
Frequently Asked Questions
-
How does author's supervision differ from technical supervision?
Author's supervision controls compliance of works with design solutions and helps resolve issues related to the project. Technical supervision is more oriented towards work quality, volumes, documentation, and compliance with construction requirements.
-
Can supervision be connected if construction has already started?
Yes, you can connect at any stage. First, an analysis of the current state of the object, completed works, documentation, and existing remarks is conducted.
-
How are identified violations recorded?
Remarks are drawn up in working order: indicating the section, nature of deviation, necessary actions, and those responsible. If necessary, photo fixation, acts, and reports for the customer are prepared.
-
Can supervision stop the contractor's work?
The format of authority is determined by the contract and the role of specialists on the object. Usually, the task of supervision is to identify the problem in time, fix it, and suggest a correct solution for elimination.
Why Choose Us
-
Engineering Control
We check not only the presence of completed works, but also their compliance with design solutions
-
Understanding of Construction Site
We consider real work conditions, schedule, adjacent processes, and object limitations
-
Work with Contractors
We record remarks so that they can be quickly worked out without unnecessary correspondence
-
Documentation Control
We check as-built schemes, acts, logs, and document completeness by stages
-
Risk Reduction for Customer
We help identify errors before they lead to reworks, delays, or problems during handover
-
We Will Calculate the Cost of Works
Leave a request and we will contact you shortly
Trusted By
Have Questions?
Contact Us
We will discuss your project, offer the best solution, and prepare a commercial proposal
-
Individual Approach
We take into account the specifics of your facility and business needs
-
Quick Response
We will respond within 15 minutes during business hours
-
Confidentiality
We guarantee the safety of your data